Response from Turnkey Construction
When [Member name removed] excepted my bid I told him it would be best if I start ASAP as I had a lot of projects lined up. He wanted to wait and it was a long wait Once I started he made no mention of time frame or a deadline. He would e mail me after I left and ask if I would be back the next week , not the next day but the next week. This became somewhat of a pattern with no complaining or reference to time frame. Job ways not easy. Bathroom walls and floor were in rough shape. Selected big tiles were very difficult to work with I totally gutted one bath. Did lots of electrical, plumbing, wall and floor tiles , painting , installing vanity and commode Installed two shower glass doors etc. Did a lot of work in another bathroom as well My schedule was also based on the availability of Walt' s boyfriend I could not get an early start and I had to shut down when he had to leave There was no mention of time frame for most of the job It was a very complicated job Very time consuming he always e mailed me and asked if I would be back in a week or so. , not the next day. Obviously I felt no pressure to dedicate all my time to his project He was well aware of the fact that I had other projects going on We were not really messy We always did a basic clean up Walt started to get overly picky going out of his way to find things to complain about. One example would be an e mail complaining about thin set mortar on his front storm door Next time we went ther I checked it out and had to point it out to my helper. There was a very small amount of mortar residue from us going in and out. One swipe of a rag and it was gone This job did not go very smooth but we gave him a good finished product I apologized to [Member name removed] and thanked them for their patience All in all. they were nice guys and I did everything [Member name removed] requested I am sure they are as happy as I am that the job is completed If [Member name removed] requested a time frame I am sure I would have done my best to obligate him There was no reference to completion date or time frame