Three bids were acquired with Collin Services being the lowest. They said they would start in two weeks and did start in two weeks. Gave them an idea of what I wanted to spend and they stayed within budget. Caroline and Collin designed kitchen and finished product reflected that design. Though they typically did not work an entire 8 hour day, hours at site were all productive with no down time. Though the original estimate of time to completion was two weeks, total project took four weeks. The kitchen was functional within two weeks, but final "punch out" not complete for four weeks. That said, the finished project was so well done and exactly to my satisfaction, the extra time was not a problem for me.
Description of Work: They gutted out the kitchen, frame out area, sheetrock kitchen area, frame out ironing board cabinet with plywood, plumbing, installation, relocate gas line, wire and install new recessed lights (5), run under counter lights (4), dedicated electrical line for microwave and install new plug, extra counter outlets, wire plugs (5), tile back-splash on walls in kitchen, assemble all wall and base IKEA cabinets(13), hang and install, drill and install knobs on all cabinets (26), deck counter top with plywood, granite material fabrication/installation, haul and dump trash, relocate AC vent and repair sheetrock hole, cut and install microwave vent to outside wall, kitchen sink/cutout 11/4 inch lead waste T/replace with 11/4 PVC sanitary T, repair rotten floor in kitchen area, install concrete board on floor, diagonal lay floor tile, repair sheetrock above windows and doors in all rooms (16 total), and repair sheetrock stairwell. Installed plug and switch for disposal/dishwasher. Old wiring removed and electrical switches moved. Run water line for fridge, install ice-maker valve box, install electrical outlet in living room and bedroom.