+ 9 moreDue to our schedules, we didn't really get going until January, 2012. The design and selection process took until the end of April and construction began May 22, 2012 and ended June 29, 2012. Steve Amick is wonderful in setting a schedule ahead of time for the work to be done and then being sure it is completed as scheduled. We had several setbacks during the 6 weeks (due to things we discovered after demolition of walls),, but Steve was amazing in the management of the project and still getting everything done on time.
Description of Work: The work done included a complete kitchen, laundry room, bathroom, half bathroom remodel, and new cabinets in the family room, kitchen, laundry, bathroom, 1/2 bath and dining room, plus a few other things in other parts of the house. The cost indicated above is all inclusive including new appliances, cabinets, fixtures, lighting, hardware, labor and materials, etc., This process began in 2011 when I purchased an Angies List Big Deal cabinetry design with Pacific Northwest Cabinets, and Steve was the contractor they recommended. I interviewed 4 different firms, but was most impressed with Spectrum homes and Pacific Northwest Cabinetry. While their bids were generally comparable, Steve was the only contractor who had his subs come out to the house before he submitted a bid. We lived in the house during the remodel and had subcontractors there practically every day. They were all very professional, easy to be around and did great work. These included framers, plumbers, electricians, door and window companies, drywall, tile and flooring, and others. I would definitely recommend Spectrum Homes. Steve is very responsive and easy to work with. Details of the remodel are: Kitchen & Dining Rooms: gutting of kitchen to studs, opening wall between the two rooms and installation of bi-fold glass doors, installation of new header beam, adjusting door sizes and installation of glass door, installation of new cabinets, windows, lighting, granite counters, tile back splash, linoleum tile floor, lighting, adjustment of heat ducts, re working plumbing from wall to be taken out to an outside wall, installation of upgraded electrical panel, new appliances and fixtures, new sliding door to deck, etc. Laundry: new cabinets and floor, repositioning of plumbing for rearrangement of appliances and sink, lighting. 1/2 bath: new cabinets and toilet, refinishing of existing shower, lighting. Living Room: installation of french door to hallway. Upstairs Bath: complete gutting of room to studs; electrical and plumbing, new tub, cabinets, fixtures, lighting, tile, and tile floor.