Hard working union-experienced men. Call now for your free estimate!
"Raschke Concrete and Construction was hired to pour 2 concrete slabs and 2 transition pieces at our business (The Sandstone Retreat) totaling 14 yards on concrete for the price of $10,000. The owner Gabriel Raschke assured me that it would be no problem and that he could start next but he required half the money to get started. We told him that my wife and I got him name off of Angi's list but since we didn't know him we were only willing to give him 2,500 now and when he was finished with the forms we would give him a check for $5,000 to pay for the 14 yards of concrete. The concrete was supposed to be poured on Friday February 28th, 2025 so I took a personal day to supervise the job. Gabriel Raschke came Friday morning and informed me that the concrete will not be there until Monday March 3rd, 2025. I was not happy about this but if it had to be pushed back then it gets pushed back but I told him that I would not be on site that day. I instructed a good friend that was doing some work at the Sandstone Retreat that day to keep an eye on them and let me know how the concrete progress was going. The 1st concrete truck showed up around 12:45 on Monday March 3, 2025 and Raschke Concrete and Excavation started the concrete slab. I called my friend and was asking how the concrete was going. He informed me that they started so I said send me some pictures. He sent me some pictures and had some concerns about how it looked but I figured that it would be fine. My friend sent me more pictures about 20 minutes later and confirmed my concerns. I called my friend at the Sandstone and asked what was going on and he told me that it's not good. I sent Gabriel Raschke a text at 3:16 PM and asked what was going on but didn't get a response back from him until 6:37 PM saying that he is going to call the concrete company because they put to much calcium in the concrete and it set up to quickly. Gabriel called me and told me the whole story and said that there was too much Calcium in the concrete and he could get the job done because it set up to quickly. I told him that was not my problem and asked him how they are going to fix it. He said that he will put a skim coat of mortar on it and it would look good. I told him that won't fix the problem and that I want it all chipped out and removed."
Patrick M on April 2025
Hard working union-experienced men. Call now for your free estimate!
"Raschke Concrete and Construction was hired to pour 2 concrete slabs and 2 transition pieces at our business (The Sandstone Retreat) totaling 14 yards on concrete for the price of $10,000. The owner Gabriel Raschke assured me that it would be no problem and that he could start next but he required half the money to get started. We told him that my wife and I got him name off of Angi's list but since we didn't know him we were only willing to give him 2,500 now and when he was finished with the forms we would give him a check for $5,000 to pay for the 14 yards of concrete. The concrete was supposed to be poured on Friday February 28th, 2025 so I took a personal day to supervise the job. Gabriel Raschke came Friday morning and informed me that the concrete will not be there until Monday March 3rd, 2025. I was not happy about this but if it had to be pushed back then it gets pushed back but I told him that I would not be on site that day. I instructed a good friend that was doing some work at the Sandstone Retreat that day to keep an eye on them and let me know how the concrete progress was going. The 1st concrete truck showed up around 12:45 on Monday March 3, 2025 and Raschke Concrete and Excavation started the concrete slab. I called my friend and was asking how the concrete was going. He informed me that they started so I said send me some pictures. He sent me some pictures and had some concerns about how it looked but I figured that it would be fine. My friend sent me more pictures about 20 minutes later and confirmed my concerns. I called my friend at the Sandstone and asked what was going on and he told me that it's not good. I sent Gabriel Raschke a text at 3:16 PM and asked what was going on but didn't get a response back from him until 6:37 PM saying that he is going to call the concrete company because they put to much calcium in the concrete and it set up to quickly. Gabriel called me and told me the whole story and said that there was too much Calcium in the concrete and he could get the job done because it set up to quickly. I told him that was not my problem and asked him how they are going to fix it. He said that he will put a skim coat of mortar on it and it would look good. I told him that won't fix the problem and that I want it all chipped out and removed."
Patrick M on April 2025
Vibe Tribe Consulting LLC specializes in concrete repair, masonry repairs and small concrete pour services.
"We were thrilled with the work performed. The contractor got us scheduled quickly and provided a top notch job for a fantastic price. Already looking at them for another job."
Garvis R on October 2024
Vibe Tribe Consulting LLC specializes in concrete repair, masonry repairs and small concrete pour services.
"We were thrilled with the work performed. The contractor got us scheduled quickly and provided a top notch job for a fantastic price. Already looking at them for another job."
Garvis R on October 2024
My name is Brandon Taylor. I am a small business owner and looking forward to working with you. I have been in service for 2 years now under my own business but have worked in construction for 5 years. I have many years of experience under sub-contracting in a variety of trades. I started my business in 2015, however, before then I was working as a laborer and sub-contractor. I recently decided to branch out and perform my services under my own business and give my customers and clients the professional results they deserve. I take my work very serious and strive to be the best in every aspect of my business. You can find my business on several websites including Angies List and BuildZoom. These websites you can post your jobs and you can get a variety of quotes on the job and you (homeowner) get to choose who you want to complete your job. I also strongly encourage you to leave me reviews on my work and your satisfaction. One of the best marketing techniques is Word-of-Mouth and this will help your community trust a reliable professional as well as help me build my business as a small business owner. Thank you. Skilled labor isn't cheap and cheap labor isn't skilled!
My name is Brandon Taylor. I am a small business owner and looking forward to working with you. I have been in service for 2 years now under my own business but have worked in construction for 5 years. I have many years of experience under sub-contracting in a variety of trades. I started my business in 2015, however, before then I was working as a laborer and sub-contractor. I recently decided to branch out and perform my services under my own business and give my customers and clients the professional results they deserve. I take my work very serious and strive to be the best in every aspect of my business. You can find my business on several websites including Angies List and BuildZoom. These websites you can post your jobs and you can get a variety of quotes on the job and you (homeowner) get to choose who you want to complete your job. I also strongly encourage you to leave me reviews on my work and your satisfaction. One of the best marketing techniques is Word-of-Mouth and this will help your community trust a reliable professional as well as help me build my business as a small business owner. Thank you. Skilled labor isn't cheap and cheap labor isn't skilled!
we are Pro-Line Construction we have 15 years of experience and we strive to meet all of our customers needs we are very professional and do great work that we can stand by
we are Pro-Line Construction we have 15 years of experience and we strive to meet all of our customers needs we are very professional and do great work that we can stand by
We are a small sub-contractor. The business currently consists of four employees and we look to grow each day. Billing will be discussed before starting any project and generally due within 30 business days.
We are a small sub-contractor. The business currently consists of four employees and we look to grow each day. Billing will be discussed before starting any project and generally due within 30 business days.
Brennstuhl Construction Inc has been serving the North Central Ohio since 2001. We provide concrete services for all residential and commercial needs. We are fully insured and will stand behind our work. Our main goal is, and always will be to provide complete customer satisfaction with every client we service. Contact us today to find out why we are considered the area's best!
Brennstuhl Construction Inc has been serving the North Central Ohio since 2001. We provide concrete services for all residential and commercial needs. We are fully insured and will stand behind our work. Our main goal is, and always will be to provide complete customer satisfaction with every client we service. Contact us today to find out why we are considered the area's best!
Contracting & Subcontracting crew.
Contracting & Subcontracting crew.
Mudjacking can be an expensive foundation repair process, but in many cases, it’s well worth the investment. This is especially true if you’re lifting a portion of sunken foundation slab back into place. In that case, mudjacking can help avoid major structural damage and even home collapse by restoring the integrity of your structure with minimally invasive procedures. Mudjacking a concrete patio, walkway, or sidewalk can be worthwhile because it removes tripping hazards and makes your outdoor area more aesthetically appealing.
Concrete repair costs range anywhere from about $0.10 to $0.15 per linear foot to fill minor cracks, to about $6 to $14 per square foot to replace damaged concrete slabs. Repair costs vary widely depending on the size and type of work needed. For example, replacing 100 square feet of driveway will cost between $600 to $1,400, on average.
The average cost of mudjacking is around $5 per square foot of concrete, with most concrete leveling jobs totaling between $3 and $8 per square foot. The typical cost to fix a sinking portion of concrete slab with mudjacking is around $1,100. The price you’ll pay depends on the size of the concrete slab you need to be leveled, the accessibility of the slab, and the type of material your contractor uses beneath the concrete to lift it back into place.
In most cases, no, mudjacking is not possible as a DIY job. Not only do you need specialized equipment to cut into your slab and pump the cementitious material underneath it, but it’s also a challenging process, and the consequences of making mistakes include additional structural damage to your home. It’s possible to rent mudjacking equipment to attempt a DIY repair, but the risk of added property damage usually isn’t worth the money you’ll save on labor, especially if the concrete you’re lifting is a part of your home’s foundation.
Concrete contractors typically charge anywhere from $6 to $14 per square foot. Cost factors include job size, site prep, base material, accessibility, your location, concrete finish, and concrete thickness. Removal of existing concrete, asphalt, deck, pavers, and grass will cost anywhere from $1 to $6 per square foot. Homeowners can often save money by removing and disposing of existing pavers, decks, and grass. Breaking up and hauling away concrete and asphalt is difficult and time-consuming without the proper equipment and may be worth having the pros do that work.