Mallett Buildings Inc
Concrete Flatwork - Repair & Resurface, Poured Concrete Wall Service, Concrete Foundation Installation,
About us
Additional DBAs - Mallett Buildings, Classic Floors Progressive Buildings LLC & A Trade Name Of Progressive Buildings LLC. Additional email - [email protected].
Services we offer
Garages, barns, sheds & home buildings.
Reviews
4.237 Reviews
Number of Stars | Image of Distribution | Number of Ratings |
---|---|---|
65% | ||
16% | ||
3% | ||
5% | ||
11% |
Showing 26-37 of 37 reviews
Hugh J.
May 2020
Great work from the design to the finished product.
Ben M.
May 2020
From contract signing to construction, everything went very smooth. I would recommend Mallett to anyone needing a building.
Joseph A.
May 2020
Very well...went up fast and quality workmanship
Joseph A.
May 2020
Great...it went up fast and workmanship was good.
Joseph H.
May 2020
Project went well, very nice building and design
Michelle R.
Apr 2020
Horrible experience, this business has no customer service concerns. Everyone you call or email you talk to a different person so no one knows what’s going on,they promise to fix things when the crew shows up they mess up something else, really wish I wouldn’t have paid them I trusted that they would handle the repairs and they did not. I actually do not want them on my property because they will damage something else. We were promised gutters because they damaged so many things, they tell us in an email a few days ago they are backed up well they did a building right down the road that’s not complete... I ignored the bad reviews please don’t go somewhere else with your business. I’m contacting the BBB.
Kathleen H.
Aug 2018
Go somewhere else to get a building. You tell them about problems and they just ignore you. Act like they are going to fix but never do. In the end they tell you this is the first time they ever heard about this. The people you spoke to no longer work there. A fake vice president called us but they know nothing about what you are talking about. The entry door was dented from day one. An inspecter came and found scratches on roll up door. They were suppose to touch up. A screw is missing in the back doorknob. The concrete has dips in it. They are not going to fix anything. Even the people that work for them doesn't understand what is going on because they lost their boss. Inspector has list but we do not know where this inspector and the list is. The vice president should have a list but now no one knows anything. Poor communications throughout company. We knew we had to pay at different steps in the process. We thought we would pay Mallard not the contractors with names like Caddyshack and Natures Best, which all go back to Mallett. You have no choice but to sign and pay when work is done or you will be charged an extra $50 for everyday you don't. My husband spoke to Mr Mallett total waste of time. Very rude. All about himself. Doesn't care about what the quality care of a number 1 building should be. If you truely cared about customer satisfaction, you would have replaced walk in door, touched up roll up door, and added a screw to the doorknob. At which point I never would have written this review. We were also wanting another building. NOT GOING TO HAPPEN NOW. Don't bother responding because it's going to be all about Mallett anyway. Who cares about the customer? It would actually be a zero but that is not a option. By the way my husband never initialed a single line of your building inspection report, so none of the items pertained to our building. Yes he sign it and paid because he had to or he would have to pay an extra $50 dollars a day. We thought we were dealing with honest people that you could call and tell them your problems. Customer satisfaction- repair problems. All I can say is what goes around comes around. Ya'll were repeated told about repairs. You stay in business by cheating people. If you didn't have such a high turnover in employees, first we were suppose to speak to Bonnie, then she no longer works there. Next we are suppose to speak to Johnathan, which we told about the problems but then he no longer works there. We are not good at remembering names of people we speak to once. The inspector that came before slab was poured knew about it. He said the repairs would be done. The fake vice president we spoke to knew about all the problems. As for roll up doors, concrete and doors not locking. The gutter crew adjusted doors and cleaned at bottom of doors. That's how they got repaired, not that you sent someone over immediately. I have pictures of walk in door with dings in it the first day the door was put up and the walls are not completely up. Anyone would like me to email to them let me know, [email protected]. The least I can do is educate others. Be sure to completly check your building after each phase. Write any problems on the paper you will have to sign and pay. It will say on this paper if you do not sign and pay you will be charged $50.00 for everyday until signed and paid. Do not just call and tell anyone. They will just lie and say they will repair. Do not trust their supposed inspector when he comes. He will tell you they will set up a time to repair items. Will not happen. This inspector came before concrete was poured. Make notes of names of everyone you speak to and time. Most important you will have to pay and sign. Write all problems down on paper. The inspector report he is talking about he sent is the paper you will see at time of payment. As I said earlier, note every repair down on paper before signing. This paper says to initial all that pertains to building. My husband never initialed any anything. Truth! Mr Mallett or someone in his company hide my Google review. I managed to retrieve it. Why would anyone do that unless they have something to hide.
Keisha L.
Dec 2012
From walking in the door and getting an estimate to the final delivery of roof was exceptional! The office was nice and clean and the salesman was very professional!
MICKEY M.
Oct 2012
The building was order on 5/15/12. Fifty six days later the building was started on 7/11/12 and halted by the city of Lafayette on 7/13/12 because Mallett Buildings did not obtain a permit which the salesman Mr. Kyle Lyons told me at the time I ordered the building, 5/15/12, he would obtain a permit. I called him when the crew arrived and informed him the crew did not have the permit. He told me he didn't get the permit but to let the crew start and he would get the permit. He did not get the permit and the city shut down the contruction of the building. The Mallett building contract states in two places that they would not start or order material for the building until a permit was sent to them. Since Mr. Lyons said he was getting the permit and the material arrived I assumed he had the permit.
That was the first of many problems and lies.
After weeks of hearing his lies that he was going to get the permit, I went and it took me two days the clear up the confusion at the permit office and I had to pay a fine which made the permit double what it would have been. I finally got the permit on 7/24/12 and Mallett Buildings was notified by email from the permit office that the permit had been issued and the crew did not arrive until 7/27/12. Mr. Lyons had 56 days to get the permit to began with and when he didn't he lied about going to get the permit for almost two weeks and if I had not gone to get the permit my building would still be unfinished. I have the recorded conversation on my cell phone and the owner of the company Mr. Lee Mallet told me I was lying, that Mr. Lyons did not say he was going to get the permit. These are bottom feeding people.
During the time the construction of the building was halted it rain several times and the wood on the cheap doors molded up.
I ordered the building with 6" over hangs all around, I got 2" over hangs and now I have to get gutter for the patio portion of the building because the rain splashes on the cement.
I ordered the building with metal doors and door frames with no less than ANSI 2 door knobs and dead bolts. He bought the cheapest doors and door knobs all keyed different and no dead bolts. I have three personnel doors. Now I have to buy the door knobs and dead bolts and I will have to hole saw the hole for the dead bolt. The door frames are made of wood and not steal as I ordered them.
I ordered a role up door with a chain and sprocket set up to open the door. He bought the cheapest door with a little 1/4" rope knotted in the middle to pull it up and down.
When the material arrived the person who unloaded it was not a qualified fork lift operator. He dropped all of the material off the forks instead of setting down blocks of wood to set the material on top of. He drop the trust from about six foot in the air and broke one of them in half and of course jarred all the rest of them so they were no longer true. He dropped and dragged or pushed all of the material and broke every strap that was holding the wood together. There were several damaged pieces of tin and wood. The new material did not arrive until the crew came back on 7/27/12 and the damage was reported on 7/11/12, the first day the crew arrived. He damaged the role up door crate so bad the crew could not use it to transport the role up door to the back yard. They had to dismantle the crate and carry the door by hand.
Now for the crew. All mexicans that could not speak english except for the foreman. They urinated in the corner of my back yard for four days, which I didn't know was happening at the time. I am still finding trash in my landscaping, the landscaping they didn't trample, cut down, or break off. They broke several pots and landscaping decorations. They were not going to cement the post in the ground. I had to go and buy bags of cement 48 bags. There was a drain I dug up prier to there arrival and showed the foreman. He need to put the first post on the outside of the drain. He lay out the post incorrectly and was trying to stab the corner post on top of the drain which would have been one and a half feet to shallow the meet the 120 mile an hour rating and once the weight of the building settled the drain would have been broken. I had to make him do it correctly. If I had not been there the building would have been constructed incorrectly. The roof leaked on the first rain and all the screws on the roof had to be tightened. They installed bent tin and some of the tin does not over lap properly. They left over 60 screws on the roof which were rusting on the tin. I brought them a trash can to put trash in and they would not use it, they just keep throwing food containers and other construction trash where ever they were finished with it. They did not over lap the tin where the two over hangs meet the building and covered it up with trim and I had to go and caulk all of the trim to prevent it from leaking inside the building.
Mr. Kyle Lyons was informed about all this as it was happening and he did nothing about it, so I called the owner Mr. Lee Mallett and he was arrogant and condescending and also did nothing to correct the matter. I spoke to a lawyer friend of mine and he told me it wouldn't be worth the time and frustration to sue them for the little money I could claim for damages and a poorly constructed building.
So here I am trying to warn other people about Mallett Buildings. They will lie to you and call you a liar when you call them on it!
That was the first of many problems and lies.
After weeks of hearing his lies that he was going to get the permit, I went and it took me two days the clear up the confusion at the permit office and I had to pay a fine which made the permit double what it would have been. I finally got the permit on 7/24/12 and Mallett Buildings was notified by email from the permit office that the permit had been issued and the crew did not arrive until 7/27/12. Mr. Lyons had 56 days to get the permit to began with and when he didn't he lied about going to get the permit for almost two weeks and if I had not gone to get the permit my building would still be unfinished. I have the recorded conversation on my cell phone and the owner of the company Mr. Lee Mallet told me I was lying, that Mr. Lyons did not say he was going to get the permit. These are bottom feeding people.
During the time the construction of the building was halted it rain several times and the wood on the cheap doors molded up.
I ordered the building with 6" over hangs all around, I got 2" over hangs and now I have to get gutter for the patio portion of the building because the rain splashes on the cement.
I ordered the building with metal doors and door frames with no less than ANSI 2 door knobs and dead bolts. He bought the cheapest doors and door knobs all keyed different and no dead bolts. I have three personnel doors. Now I have to buy the door knobs and dead bolts and I will have to hole saw the hole for the dead bolt. The door frames are made of wood and not steal as I ordered them.
I ordered a role up door with a chain and sprocket set up to open the door. He bought the cheapest door with a little 1/4" rope knotted in the middle to pull it up and down.
When the material arrived the person who unloaded it was not a qualified fork lift operator. He dropped all of the material off the forks instead of setting down blocks of wood to set the material on top of. He drop the trust from about six foot in the air and broke one of them in half and of course jarred all the rest of them so they were no longer true. He dropped and dragged or pushed all of the material and broke every strap that was holding the wood together. There were several damaged pieces of tin and wood. The new material did not arrive until the crew came back on 7/27/12 and the damage was reported on 7/11/12, the first day the crew arrived. He damaged the role up door crate so bad the crew could not use it to transport the role up door to the back yard. They had to dismantle the crate and carry the door by hand.
Now for the crew. All mexicans that could not speak english except for the foreman. They urinated in the corner of my back yard for four days, which I didn't know was happening at the time. I am still finding trash in my landscaping, the landscaping they didn't trample, cut down, or break off. They broke several pots and landscaping decorations. They were not going to cement the post in the ground. I had to go and buy bags of cement 48 bags. There was a drain I dug up prier to there arrival and showed the foreman. He need to put the first post on the outside of the drain. He lay out the post incorrectly and was trying to stab the corner post on top of the drain which would have been one and a half feet to shallow the meet the 120 mile an hour rating and once the weight of the building settled the drain would have been broken. I had to make him do it correctly. If I had not been there the building would have been constructed incorrectly. The roof leaked on the first rain and all the screws on the roof had to be tightened. They installed bent tin and some of the tin does not over lap properly. They left over 60 screws on the roof which were rusting on the tin. I brought them a trash can to put trash in and they would not use it, they just keep throwing food containers and other construction trash where ever they were finished with it. They did not over lap the tin where the two over hangs meet the building and covered it up with trim and I had to go and caulk all of the trim to prevent it from leaking inside the building.
Mr. Kyle Lyons was informed about all this as it was happening and he did nothing about it, so I called the owner Mr. Lee Mallett and he was arrogant and condescending and also did nothing to correct the matter. I spoke to a lawyer friend of mine and he told me it wouldn't be worth the time and frustration to sue them for the little money I could claim for damages and a poorly constructed building.
So here I am trying to warn other people about Mallett Buildings. They will lie to you and call you a liar when you call them on it!
Herman A.
Jun 2012
I wouldn't trust him to build anything for me, not even a dog house.
Maureen G.
Jun 2011
Just save yourself the headache and pay a little more to someone who will do it right. Believe me you will be paying more for it later on. Don't choose Mallett Buildings!!!!!
Herman A.
Sep 2010
They didn?t use the black felt when they poured the concrete for the garage floor slab and walkway and it made contact with the metal. That will eventually eat the metal. The guy who did the cement side walk did a bad job, it was leaning the wrong direction. It is suppose to lean away from the building so rain would not collect. They had to tear out the side walk and re-do it which is just as bad. Also, water collects in puddles inside the garage so you have to push out the water. It?s supposed to be on a tilt so it doesn?t collect. The gentleman in charge of the concrete poring was completely unprofessional. He was receiving phone calls and answering them when he should have had it off. When they were pouring the concrete, the other guys couldn?t keep up since he was on the phone! I would never recommend them to anyone. Because of all this, they have delayed my other projects. The building its self deserves an A, a different crew did that work but the concrete work deserves all F.
Licensing
State Contractor License Requirements
All statements concerning insurance, licenses, and bonds are informational only, and are self-reported. Since insurance, licenses and bonds can expire and can be cancelled, homeowners should always check such information for themselves. To find more licensing information for your state, visit our Find Licensing Requirements page.
*Contact business to see additional licenses.
FAQ
Mallett Buildings Inc is currently rated 4.2 overall out of 5.
No, Mallett Buildings Inc does not offer free project estimates.
No, Mallett Buildings Inc does not offer eco-friendly accreditations.
No, Mallett Buildings Inc does not offer a senior discount.
No, Mallett Buildings Inc does not offer emergency services.
No, Mallett Buildings Inc does not offer warranties.