This is a local, family-owned business, that is excellent to work with -- very friendly and polite. Their craftsmanship is top-notch, and, just as important, they are people that you can really trust. I felt comfortable leaving my house to go to the office all day, while they were in my home working. This is a wonderful company that I would highly recommend to everyone.
Description of Work: Completely remodeled three bathrooms and a kitchen... MASTER BATHROOM Demolition: Removed tub, toilet, shower, vanity top, faucets, linoleum flooring, baseboards, access panel to bedroom, and medicine cabinet. Tile: Floor (Installed backerboard and ceramic tile), Shower (Installed pre-slope, shower pan liner, floor tile, wall tile, and recessed tile niche). Glass Door: Installed frameless glass shower enclosure with door. Vanity Top: Installed 5’ granite vanity top with 2 glass vessel bowls. Plumbing: Installed toilet, shower valve & trim, 2 lavatory faucets. Electrical: Installed lights above vanity, and bedroom pendant light. Carpentry/Drywall: Installed baseboard, mirror, towel bar, and toilet paper holder. Patched bedroom wall, mud and finish sand. CHILDREN'S BATHROOM Demolition: Removed tub, toilet, vanity top, linoleum flooring, baseboard, and medicine cabinet. Tile: Floor (Installed backerboard and ceramic tile), Shower (Installed backerboard and ceramic tile on tub surround to ceiling, including 2 corner shelves. Vanity Top: Installed 31” granite vanity top with glass vessel bowl. Plumbing: Installed toilet, tub, tub/shower valve and trim, and lavatory faucet. Electrical: Installed light above vanity. Carpentry/Drywall: Installed baseboard, mirror, towel bar, and toilet paper holder. Patched bathroom wall, mud and finish sand. POWDER ROOM Demolition: Removed toilet, vanity top, baseboard. Vanity Top: Installed 31” granite vanity top with glass vessel bowl. Plumbing: Installed toilet, lavatory faucet. Electrical: Installed light above vanity. Carpentry/Drywall: Installed baseboard, mirror, towel bar, and toilet paper holder. Patched bathroom wall, mud and finish sand. KITCHEN Demolition: Removed existing counter tops, sink, and faucet. Tile: Installed tile backsplash between counter top and bottom of upper cabinets. Counter: Installed granite counter tops, including island. Plumbing: Installed double recessed sink, and faucet.