Find top-rated Pros in your area

Enter a zip code and get matched to businesses near you.

Critical Path Construction

Kitchen and Bath Remodeling, General Remodeling, Basement Remodeling,

About us

Critical Path Construction, is a professional General Contracting company with experience in commercial and residential construction. At Critical Path, we provide services that achieve quality products on time and within budget. We monitor construction activities to ensure compliance with plans and specifications. Critical Path provides professional work services with great construction ethics: keeping work area clean, professional construction attire, and respectful attitude.

Business highlights

15 years of trusted experience

Services we offer

Our excellent resources allow Critical Path to perform a variety of construction projects and services from residential construction, renovations, commercial construction, construction management, consultation, etc. We install new homes, windows, doors, framing, flatwork, block, etc. permitting plan review site assessment

Amenities

Free Estimates
Yes


Accepted payment methods

Check

Photos of past projects

Reviews

5.02 Reviews
Number of StarsImage of DistributionNumber of Ratings
5
100%
4
0%
3
0%
2
0%
1
0%


Rating CategoryRating out of 5
quality
5.0
value
4.0
professionalism
5.0
responsiveness
5.0
punctuality
5.0
Showing 1-2 of 2 reviews

DERRELL G.
08/2015
5.0
remodeling, home remodeling
  + 0 more
They walked me through the plan preparation and drawing process, required a 20% deposit for permits and starting slab. The payments were spaced out according to the progressiveness of the work. They were very patient with me being nosy trying to see what was going on. I watch the walls go up, I had an existing roof so they were inside installing gypsum board real quick. The guys that came to my home were all respectful. The outcome was beautiful, I had all the space I needed plus more, although i need to clean my closet. Mr Wil helped me design my closet shelving and hanging racks. These guys are awesome, I will never let anyone else into my home except critical path construction.
Description of Work: Addition of den, master closet and remodel master bath.

Rating CategoryRating out of 5
quality
5.0
value
4.0
professionalism
5.0
responsiveness
5.0
punctuality
5.0

Yes, I recommend this pro
$60,000

christine L W.
08/2015
5.0
home remodeling
  + -1 more
I would just like to say that the work was done in a timely and professional manner. The quality of work was very good and the service was friendly. I recommend this company and I would call them again for my home improvement project. The company employees were courteous, respectful, timely and project came within budget.
Description of Work: Remodel two bathrooms

Rating CategoryRating out of 5
quality
5.0
value
4.0
professionalism
5.0
responsiveness
5.0
punctuality
5.0

Yes, I recommend this pro
$12,000

    Contact information

    2546 Westchester Dr., Riviera Beach, FL 33407


    Service hours

    Sunday:
    Closed
    Monday:
    8:00 AM - 5:00 PM
    Tuesday:
    8:00 AM - 5:00 PM
    Wednesday:
    8:00 AM - 5:00 PM
    Thursday:
    8:00 AM - 5:00 PM
    Friday:
    8:00 AM - 5:00 PM
    Saturday:
    Closed

    Licensing

    Bonded

    Insured

    Eco-friendly Accreditations

    LEED Accredited Professional
    No
    Energy Star Partner
    No
    EPA Lead-Safe Certified
    Yes
    Use Green Products or Work Practices
    No
    State Contractor License Requirements

    All statements concerning insurance, licenses, and bonds are informational only, and are self-reported. Since insurance, licenses and bonds can expire and can be cancelled, homeowners should always check such information for themselves. To find more licensing information for your state, visit our State Contractor License Requirements page.

    *Contact business to see additional licenses.


    Service Categories

    Kitchen and Bath Remodeling,
    General Remodeling,
    Basement Remodeling,
    Sunrooms and Patio Enclosures,
    Doors,
    Interior Painting,
    Exterior Painting,
    Homebuilders,
    Garage and Shed Building,
    Windows,
    Framing,
    Concrete Driveways

    FAQ

    Critical Path Construction is currently rated 5 overall out of 5.

    Sunday: Closed

    Monday: 8:00 AM - 5:00 PM

    Tuesday: 8:00 AM - 5:00 PM

    Wednesday: 8:00 AM - 5:00 PM

    Thursday: 8:00 AM - 5:00 PM

    Friday: 8:00 AM - 5:00 PM

    Saturday: Closed

    Critical Path Construction accepts the following forms of payment: Check
    Yes, Critical Path Construction offers free project estimates.
    Yes, Critical Path Construction offers eco-friendly accreditations.
    No, Critical Path Construction does not offer a senior discount.
    No, Critical Path Construction does not offer emergency services.
    No, Critical Path Construction does not offer warranties.
    Critical Path Construction offers the following services: Our excellent resources allow Critical Path to perform a variety of construction projects and services from residential construction, renovations, commercial construction, construction management, consultation, etc. We install new homes, windows, doors, framing, flatwork, block, etc. permitting plan review site assessment

    Contact information

    2546 Westchester Dr., Riviera Beach, FL 33407


    Service hours

    Sunday:
    Closed
    Monday:
    8:00 AM - 5:00 PM
    Tuesday:
    8:00 AM - 5:00 PM
    Wednesday:
    8:00 AM - 5:00 PM
    Thursday:
    8:00 AM - 5:00 PM
    Friday:
    8:00 AM - 5:00 PM
    Saturday:
    Closed