Marcos (contractor) did a beautiful job on everything! While we were deciding on cabinets, placement of sinks, etc., he gave suggestions and ideas to guide us. He suggested suppliers for the tile and granite counters(granite was installed by a company Marcos suggested). We chose the stone tiles we wanted in the shower, and Marcos created a design pattern we love. He told us 10 days start to finish, and completed the original work in that promised time. We made the decision to install the new doors and frames near the end of the original job, so this was done a week later (at an agreed upon time). He made sure that we were absolutely happy with every aspect of the job. The clear glass shower door (2 sides of shower are now clear glass) was installed by a shower door company and the installer made the comment to us that he was very impressed with the tile installation job on our shower. He obviously sees many installation jobs in his line of work. Marcos did a very professional job to our complete satisfaction and he cleaned everything up very nicely. Occasionally, he was not punctual in arriving when he had said he would, but this was not a major issue.
Description of Work: Complete Remodel of Master Bath: Tear out of old flooring (6" ceramic tile), drop ceiling, 3 ft. wall at end of old shower, old florescent lighting, cabinets, counter, and medicine cabinet. Installation included: 16" ceramic floor tile laid(on a diagonal), replumb shower so that faucet is on opposite wall (old faucet was in torn out wall), create new shower using natural stone tiles (Marcos created the design using two different stone colors and built a corner seat), replumb sinks to go from a single sink to 2 sinks, set new cabinets, patch wall where medicine cabinet had been, install new lighting fixtures, add molding around the mirror to frame it, install towel bars, TP holder, new baseboards, paint everything, new door and frame. Partial Remodel of Guest Bath: Tear out of old flooring (6" ceramic tile), old florescent lighting, cabinet, and counter. Installation included: 16" ceramic floor tile laid(on a diagonal), set new cabinet, install new lighting fixtures, add molding around the mirror to frame it, install light in ceiling of existing shower (we chose to keep the tub and tile as it was), TP holder, new baseboards, paint everything, new door and frame. Master Bedroom: Tear out of old carpet. Installation included: 16" ceramic floor tile laid(on a diagonal), new baseboards, new door and frame, paint everything (including existing louvered closet doors). Guest Bedroom: Tear out of old carpet. Installation included: 16" ceramic floor tile laid(on a diagonal), new baseboards, new door and frame, paint only door, frame, baseboards, and existing louvered closet doors (we had recently painted room and chose not to repaint). Foyer and Hall: Tear out of old flooring (6" ceramic tile). Installation included: 16" ceramic floor tile laid(on a diagonal), new baseboards (painted). Contractor moved all heavy furniture, removed all trash and torn out items, cleaned up after job.