countertops, doors, drywall, electrician, house painters, flooring contractor, remodeling, handyman service, interior painters, home remodeling, lighting, marble & granite, picture framing, stucco, replacement windows, woodworking
+ 14 moreTony and his crew were amazing! I really owe them big time considering the lateness of my review. Every person on his team was knowledgeable and very friendly. Ultimately, it was the quality of his specialized subcontractors, the quality of his team, and Tony's show-up-and-get-it-done attitude that made our remodel perfect. Not only do we love our kitchen but our 3/4 bathroom is now our primary bathroom (until we get a chance to revamp the old one). I personally do not believe there is another top-notch licensed contractor that is able to keep his costs low enough to be a win-win for both sides.
Description of Work: Kitchen remodel: Gutted kitchen, ripped out framing of a window, reframed the windowless area and drywalled, re-stucco'ed the outside via spraying Tex-Cote, took out venthole and patched, removed unnecessary light switches, replaced sockets with new sockets / GFE sockets, modified sockets to work properly for appliances, modified gas line to work with the new stove (angle-wise), ripped out old decaying plumbing and replaced with new copper piping, replaced moldy drywall and rotted areas and fan-dried the area to make sure the moisture would not spread, replaced the flooring and floated appropriately, painted around the new cabinets (installed by the cabinet maker), modified the electrical to fit needs, installed new switches, added under-cabinet lighting, replaced the recessed lighting, installed over-cabinet framing, installed dishwasher and hooked up plumbing, installed sink, put in the granite countertops, put in the backsplash tiling, installed the over-range microwave, hooked up plumbing to refrigerator ice-maker, hooked up stove to the gas line. Bathroom remodel: Gutted bathroom, replaced flooring with tile, installed new vinyl shower (where one did not exist prior, sink used to be there), replaced toilet, modified window & drywall & refinished to fit bathroom, moved wall opening due to new shower length, installed ikea cabinet in bathroom, put in new stackable washer and dryer, re-set the dryer venting, installed new sink/vanity, installed vanity lighting, ripped out old lighting, installed new light/fan/heater combo for shower area, repainted, installed new door to outside, installed new doorknobs, installed new blinds for 3 different windows in bathroom, installed all the bathroom fixtures and hooks.